Ivory Coast-New order for Intercem placed by Sea Invest

 

 

In connection with the current order for the delivery of a 8000 tpd cement grinding and packing plant for CIM IVOIRE in Abidjan/Ivory Coast, Intercem was granted with an additional order by Sea Invest for the raw material transport from the new ECO Hopper to the clinker silos and the additive storage.

This order includes the delivery of trough belt conveyors as well as all related components and the transfer tower on an EPC base – from the piling, the foundation works, the steel construction, the cladding of the building, the roofing of the belt bridges, the necessary filters and chutes to the electrical equipment, the installation and the commissioning.

Moreover, the scope of supply contains the measurement of the local conditions with a 3D scanning system as well as the mechanical, electrical and civil engineering.

Commissioning is planned for Q4 2017 to ensure the raw material supply for CIM IVOIRE. An extension by further trough belt conveyors is previewed in order to come up to the challenging demands for raw material supplies of the country’s cement industry in the future.

 

Masterlayout CIM IVOIRE

Other highlights from the InterCem world

Highlights

DIN EN ISO 9001 – Certification obtained

We are proud that we received the certification for quality management according to DIN EN ISO 9001 on 15.10.2021. We are constantly […]

Small scale, big impact

Olaf Michelswirth explores the advantages of modular grinding plants over larger cement production units. Read the article “Small scale, big impact”, published […]

Separators for improved grinding performance

Separators or classifiers can be key to optimising performance of grinding systems in cement plants as well as ensuring product quality targets […]

Activate your potential - Talk to us.